“A.BACCI” SCHOOL

PLACE: Sant’Elpidio a Mare (FM)

CLIENT: Municipality of Sant’Elpidio a Mare

PERIOD: 2016-2017

COMPANY’S ROLE: Structural “in situ” survey, coordination of “in situ” surveys and structural modeling, preliminary design and cost estimate

CREDITS:

The building is made of reinforced concrete structure and consists of 4 blocks divided by structural joints. Planimetric measurements are 106.80 m x 35.50 m and the building is formed of three elevations. For a total volume of 22,750.00 mc.