THE SPORT PAVILION, GARAGE AND THE BRIDGE ON “SALINE” RIVER

PLACE: Città Sant’Angelo (PU)

CLIENT: Municipality of Città Sant’Angelo

PERIOD: 2013

COMPANY’S ROLE: Structural “in situ” survey, coordination of “in situ” surveys and structural

CREDITS:

The sport pavilion has a 48X36m rectangular-shape plan and 10.30m height. The load-bearing structure consists of RC frameworks with pre-casted reinforced pre-compressed concrete roof tiles. The municipal garage has 64X11m rectangular-shape plan; the load-bearing structure is realized with unidirectional steel frameworks with corrugated roof sheet. The bridge on “Ssaline” river has 111.4m length and 13.65m width. The load-bearing structure consists of reinforced concrete walls, the deck instead is realized with 12 reinforced pre-compressed concrete beams with laying upper slab.